DECISION OSby WhyOptic

02 / The five drivers

One lever. Connected consequences.

Demand → delivery → gross profit → overhead → cash. Each control belongs to one driver, and its effects flow through the whole model.

15 levers · 1 state

Driver 04 · Overhead & Friction

Three connected levers

Sets the gross-profit floor. Fixed overhead + its change + added support. Monthly surplus equals GP less this floor. The one-off reset cost appears in the transition, once.

$0
-$15,000baseline $0+$15,000

Changes the ongoing GP floor. Delivery wages are already inside direct costs.

$0
$0baseline $0$15,000

A separate ongoing office or support addition, counted once in the overhead floor.

$0
$0baseline $0$30,000

Paid and expensed once when the Overhead stage begins; outside steady monthly surplus.

The economic corridor

Where the levers move you

Monthly gross profit, after every paid delivery wage.

Above floor

Planned GP

$51,171

at baseline

Baseline current GPPlanned GPOverhead floorCapacity ceiling

GP floor

$42,000

Planned GP

$51,171

GP ceiling

$55,548

Live relationships

The whole system responds

Demand → deliverable jobs
15.5 → 15.5
Delivery ceiling / month
16.2 jobs
Price per job
$10,500
Bought-in cost per job
$4,280
Paid delivery wages / month
$45,239
Gross profit / month
$51,171
Planned monthly surplus
$9,171
Change from baseline
$0
Lowest cash · your order
$20,000

Results include every planned lever. Reset this driver to isolate its contribution, or start from the baseline for a clean experiment.

Illustrative economics · 30-day model months · USD · nothing connects to a live businessFive drivers. Connected consequences. · Decision OS by WhyOptic