02 / The five drivers
One lever. Connected consequences.
Demand → delivery → gross profit → overhead → cash. Each control belongs to one driver, and its effects flow through the whole model.
Driver 02 · Capacity & Throughput
Three connected levers
Sets the delivery ceiling. Teams × productive team-hours ÷ hours per job. The full paid workforce stays in direct costs, including idle time: adding a team can lower profit when demand cannot fill it.
Adds delivery hours and the full paid wage bill. Equipment cash is paid on activation.
Hours available for job delivery per team. Paid hours stay a separate fixed assumption.
Better methods reduce core job hours; rework is handled under Margin.
The economic corridor
Where the levers move you
Monthly gross profit, after every paid delivery wage.
Planned GP
$51,171
at baseline
GP floor
$42,000
Planned GP
$51,171
GP ceiling
$55,548
Live relationships
The whole system responds
- Demand → deliverable jobs
- 15.5 → 15.5
- Delivery ceiling / month
- 16.2 jobs
- Price per job
- $10,500
- Bought-in cost per job
- $4,280
- Paid delivery wages / month
- $45,239
- Gross profit / month
- $51,171
- Planned monthly surplus
- $9,171
- Change from baseline
- $0
- Lowest cash · your order
- $20,000
Results include every planned lever. Reset this driver to isolate its contribution, or start from the baseline for a clean experiment.